GE Power completes wet FGD unit at NTPC’s Vindhyachal STPP

GE Power Limited has completed its first turnkey full flow wet flue gas desulphurisation (WFGD) unit at NTPC Limited’s 500 MW Vidhyanchal superthermal power project (STPP) in Madhya Pradesh. The installation is the first limestone-based WFGD to be commissioned in an NTPC plant for continuous operation. The scope of work included designing, engineering, manufacturing, testing, civil works, erection and commissioning of the system.