The Himachal Pradesh government has decided to allot the 449 MW Duggar hydroelectric project to NHPC Limited. The project has been allotted on a build-own-operate transfer basis for a period of 70 years. It is located in Chamba district.
The Himachal Pradesh government has decided to allot the 449 MW Duggar hydroelectric project to NHPC Limited. The project has been allotted on a build-own-operate transfer basis for a period of 70 years. It is located in Chamba district.
COPYRIGHT © 2017-2022 | POWER LINE