Azure Power Limited has commissioned a 150 MW solar power plant in Rajasthan. It is Phase-I of the 200 MW capacity allocated to Azure Power under SECI’s 250 MW grid-connected solar PV projects to be developed at the Bhadla Solar Park Phase III. The company will supply power to SECI at a tariff of Rs 2.48 per kWh for 25 years. With this project, Azure Power now has about 1,600 MW of operational solar projects.