NHPC Limited’s 120 MW Sewa-II power station in Jammu and Kashmir has been shut till March 31, 2021 due to damage in its head race tunnel (HRT).
The HRT carries water from intake to a power house for electricity generation. The shutdown will cause tentative loss of 157.4 MUs in generation (design energy) and 35.61 per cent in normative annual plant availability factor (NAPAF).