L&T Heavy Engineering dispatches 700 MWe steam generator for NPCIL’s project

Larsen & Toubro Heavy Engineering has dispatched the first of four 700 MWe steam generators for the Gorakhpur Haryana Anu Vidyut Pariyojana (GHAVP) 1&2 project of Nuclear Power Corporation of India Limited (NPCIL).

The unit has been despatched within 36 months, i.e., an early delivery by 12 months. The equipment was manufactured at L&T’s manufacturing facilities at Hazira and Vadodara Heavy

Engineering Works (VHEW). The work was completed by the teams of NPCIL and L&T

GET ACCESS TO OUR ARTICLES

Enter your email address

Share your work e-mail and access a free 3 month digital subscription to Power Line Magazine