NTPC completes first 5 MW block of floating solar PV project at Simhadri

NTPC Limited has completed the first 5 MW block at the upcoming 25 MW floating solar photo voltaic (PV) project at Simhadri in Andhra Pradesh.

The remaining work is expected to be completed by June 2021 after which 25MW will be made available to the grid. The project is being executed by Bharat Heavy Electricals Limited for a value of about Rs 1,100 million.