AREHFifteenL bags 150 MWac solar project

Adani Green Energy Limited’s arm, Adani Renewable Energy Holding Fifteen Limited (AREHFifteenL), has secured a 150 MWac solar energy project from Torrent Power.

AREHFifteenL had participated in a tender issued by Torrent Power Limited for procurement of power through competitive bidding process, from grid connected solar photovoltaic power projects to be setup in Gujarat. The fixed tariff for this project capacity is Rs 2.22 per kWh for a period of 25 years. The project is expected to be commissioned by the third quarter of 2022-23.