DAE invites bids for a 1.73 MW solar power project

The Department of Atomic Energy (DAE) has invited bids to supply, install, commission, and maintain a 1.73 MW grid-connected solar power project at the Indira Gandhi Center for Atomic Research (IGCAR) facility in Kalpakkam, Tamil Nadu.

The scope of work would include design, manufacture, testing at manufacturer’s works, packing, transportation by road, supply, delivery at site, unloading, handling and storage at site, complete installation, testing, integration, and commissioning of the project. The project will function without battery backup and it will export the power generated at a low voltage level. It should be completed within eight months’ time from the date of the receipt of the work order. The last date to submit the bids online is October 20, 2021.