ISRPL floats a tender for a 2.9 MW rooftop solar system in Haryana

Indian Synthetic Rubber Private Limited (ISRPL)has floated a tender for the installation and commissioning of 2.9 MW of rooftop solar systemat its manufacturing facility in Panipat, Haryana.

The scope of work comprises designing, planning, engineering, procurement, construction, erection, testing, and commissioning of rooftop solar systems on a turnkey basis. The winning bidder will also be responsible for the operation and maintenance (O&M) of the project for two years post the commissioning of the project. The bid submission deadline is October 9, 2021.

GET ACCESS TO OUR ARTICLES

Enter your email address

Share your work e-mail and access a free 3 month digital subscription to Power Line Magazine