Tripura to invest Rs 19.50 billion for uninterrupted power supply

Tripura government has embarked on a plan to bring fresh investments of around Rs 19.50 billion to ensure uninterrupted power supply in the state and upgrading infrastructure.

An investment of Rs 20 billion has been made in the last five years to strengthen the transmission and distribution system in the state’s power sector. Asian Development Bank is implementing a project of Rs 11.50 billion to revamp the state’s power sector infrastructure. With an aim to increase the state’s renewable energy capacity, the Tripura government has decided to install a 130 MW floating power plant at the Dumber Lake located in Dhalai district in collaboration with NTPC Limited.

GET ACCESS TO OUR ARTICLES

Enter your email address