NTPC flags off first coal rake dispatch from NTPC Talaipalli to NTPC Lara STPP

NTPC Limited has dispatched its first coal rake from NTPC Talaipalli coal mine to NTPC Lara super thermal power project (STPP) in Chhattisgarh.

The  merry-go-round (MGR) track length from Talaipalli to Lara is 65 km. The commencement of rake loading paves the way for Talaipalli mine to dispatch coal in a smooth and eco-friendly manner to meet the coal requirements of 1,600 MW NTPC Lara STPP.