KPI Green Energy Limited has received commissioning certificates from Gujarat Energy Development Agency (GEDA) for 7.20 MW wind-solar hybrid power project.
This project falls under the captive power producer (CPP) segment and consists of 4.20 MW of wind capacity and 3 MWdc of solar capacity. The project was specifically developed to cater to the energy needs of Nouveau Jewellery LLP, located in Surat, Gujarat.
