Bharat Heavy Electricals Limited (BHEL) has received an order from Mirzapur Thermal Energy UP Private Limited (MTEUPL) for 2×800 MW thermal power project at Mirzapur Phase I, Uttar Pradesh.
The scope of work includes supply of equipment (boiler, turbine, generator) and supervision of erection and commissioning for 2×800 MW power project based on supercritical technology at Mirzapur. The cost of the project is estimated to be greater than Rs 35 billion.
