JSW Neo Energy Limited, a wholly owned subsidiary of JSW Energy Limited, has received letter of award (LoA) for a 400 MW of wind-solar hybrid power project under greenshoe option from Maharashtra State Electricity Distribution Company Limited (MSEDCL) against MSEDCL – Phase III.
The cumulative capacity allotted under Phase – III stands at 600 MW. Subsequent to this, the company’s total locked-in generation capacity has increased to 17.6 GW, which includes a total locked-in hybrid capacity of 3.2 GW.
