IWL secures LoI from IGREL for 550 MW wind project across three states

Inox Wind Limited (IWL) has received a letter of intent (LoI) from IGREL Renewables Limited (IGREL) to execute 550 MW of wind capacity on a turnkey basis.

The project will be executed over the next 24 months across multiple sites in Gujarat, Rajasthan, and Madhya Pradesh. The 550 MW LoI exceeds the firm order of 200 MW received previously and raises IWL’s order book to 3.5 GW. As part of the project, Inox Wind will supply, install, and commission the wind turbine generators, and provide multi-year comprehensive operations and maintenance services post-commissioning.