NHPC connects 300 MW Bikaner solar PV project with ISIS

NHPC Limited has reported that its 300 MW Bikaner solar photo voltaic (PV) project has been connected with inter state transmission system (ISTS) and started injecting 31 MW power in the grid as on March 31, 2025.

The commercial declaration of part capacity of 100 MW in phases shall be intimated in due course. The complete 300 MW solar project is likely to be commissioned by August, 2025.