GE Vernova signs turbine supply agreement with Powerica for 100 MW wind power project

GE Vernova has signed an agreement with Powerica Limited for the supply and installation of 28 onshore wind turbines (WTGs), each rated at 3.8 MW, for the 100 MW Botad Wind Farm in Gujarat.

Powerica secured the project through a competitive auction conducted by Gujarat Urja Vikas Nigam Limited. The turbines will be manufactured at GE Vernova’s facility in Pune, and deliveries are scheduled to commence in the fourth quarter of 2026. The project marks the India debut of GE Vernova’s 3.8 MW turbine featuring a 154-m rotor.