Adani Green Energy Limited (AGEL), through its stepdown subsidiaries, has commercially operationalised 156 MW of renewable energy capacity and 185 MWh of battery energy storage system (BESS) capacity at Khavda, Gujarat.
The 156 MW renewable energy project has been commissioned by Adani Green Energy Twenty Six A Limited. Meanwhile, the 185 MWh BESS project has been commissioned by Adani Renewable Energy Forty Three Limited. With these additions, AGEL’s total operational renewable energy capacity has reached 20,141.80 MW, while its operational BESS capacity has increased to 3,551 MWh.
