KPI Green Energy Limited, a KP Group company, will develop a 110 MW AC/142 MW DC floating solar project at Kadana Dam in Gujarat. The foundation stone for the project was laid by the Prime Minister on September 8, 2026.
The project is being developed for Gujarat State Electricity Corporation Limited (GSECL) and marks KP Group’s entry into large-scale floating solar projects. Further, the company will undertake engineering and construction, grid connectivity and long-term operations and maintenance of the project.
