L&T secures supply order from NTPC for Nabinagar super thermal power project

Larsen & Toubro Limited (L&T) has secured a contract order for the supply and installation of the main plant package from NTPC Limited.

The order includes boiler and turbine for 3×800 MW ultra supercritical units at stage-II of the Nabinagar super thermal power project.