• Ezine Archive
  • 25 Years of Power Line
    • 25th Anniversary Edition
    • Power Line Rewind
  • Subscribe
  • Advertise
  • About Us
  • Contact Us
  • linkedin
  • twitter
  • youtube
  • Facebook
Power Line Magazine
  • Home
  • Editorial
  • Generation
  • Transmission
  • Distribution
  • Renewables
  • Regulation
  • Specials
  • Finance
  • Smart grids
  • Knowledge Bank
  • News
    • Reforms and Regulations
    • Central Sector
    • State Sector
    • Private Sector
    • Projects & Ventures
    • International News
  • Companies
  • Forum
  • Perspective
  • EXPERT OPINION
  • Infocus
    • Grid Modernisation & Strengthening
    • Metering Billing & Collection
    • Energy Management and Efficiency
    • IT & OT Integration
    • Water Management
    • Transmission Infrastructure
    • Renewable Energy
    • Power Generation
    • Substations
    • Coal-based Power Generation
    • Power Distribution in India
    • Wind Power In India
    • Diesel Engines & Gensets
  • Special Section
    • Electric Vehicles
    • Renewable Energy
    • Coal-based Power Generation
    • HVDC Technology
    • Towers and Structures
    • BTG Equipment
    • Ash Management & Handling
    • Substations & Switchgear
    • Grid Modernisation & Strengthening
    • Environmental Solutions for Power Plants
    • Hydro Power in India
    • Quality of Power in India
    • Smart Grids in India
    • Cables & Conductors
    • More…
      • Insulators
      • Microgrids
      • Smart Grids in India
      • Substation Automation
      • Power Generation
      • Solar Power
  • Industrial Power
  • People
  • INDUSTRY SPEAK
  • Company Release
  • White Papers
  • Power Data
    • Power Data
    • Power Trading
  • Photogallery
  • Videos
  • Webinars
  • TransTech
    • TransTech India 2025
    • TransTech India 2024
  • Upcoming Events
  • PowerLine South Asia
  • Sponsored Content
  • Powerline Marketplace
HomeNews

News

No Picture
Central Sector

AERB approves clearance for equipment installation at Kudankulam units 5 and 6

May 5, 2026

The Atomic Energy Regulatory Board (AERB) has approved Nuclear Power Corporation of India Limited (NPCIL) for major equipment erection at units 5 and 6 of the Kudankulam Nuclear Power Project in Tamil Nadu. The approval […]

No Picture
State Sector

MP Transco energises 200 MVA power transformer for Indore Metro

May 5, 2026

Madhya Pradesh Power Transmission Company (MP Transco) has installed and energised a new 200 MVA power transformer at the 220 kV Manglia substation in Indore to ensure reliable and quality power supply for the Indore […]

No Picture
Private Sector

AMPIN commissions 500 MWp wind-solar hybrid project in Rajasthan

May 5, 2026

AMPIN Energy Transition has commissioned around 500 MWp of interstate transmission system-connected wind-solar hybrid capacity at Fatehgarh in Barmer, Rajasthan. The project comprises around 400 MWp of solar capacity and 100 MW of wind capacity, […]

No Picture
Private Sector

HPL Electric secures Rs 2.42 billion smart meter orders from GMR Group firms

May 5, 2026

HPL Electric & Power Limited has secured new orders worth Rs 2.42 billion from multiple existing clients for the supply of smart meters. The orders have been awarded by GMR Triveni Smart Meters, GMR Kashi […]

No Picture
State Sector

Noida power department to install 250 transformers to improve supply reliability

May 5, 2026

The Noida power department has begun installing 250 new transformers across the district at an investment of Rs 0.25 billion to meet peak summer demand and prevent overloading. The transformers will have capacities of 250 […]

No Picture
Private Sector

TPREL approves plans for ingot and wafer manufacturing business

May 5, 2026

Tata Power Renewable Energy Limited (TPREL), a subsidiary of Tata Power, has approved the adoption of the photovoltaic (PV) ingot and wafer manufacturing business line. Furthermore, investment in the new line will be around Rs […]

No Picture
International News

ADB launches USD 70 billion plan for energy and digital infrastructure in Asia-Pacific

May 5, 2026

The Asian Development Bank (ADB) has launched plans to support USD 70 billion in new energy and digital infrastructure projects across Asia and the Pacific by 2035. The initiatives aim to connect power grids, expand […]

No Picture
International News

Azerbaijan’s Azerenerji to develop 500 kV line under AZURE project

May 5, 2026

Azerenerji Joint Stock Company, Azerbaijan’s vertically integrated energy company, is set to commence construction of a major high voltage transmission line as part of the Azerbaijan Scaling-Up Renewable Energy Project (AZURE) initiative. The project involves […]

No Picture
Central Sector

Ministry of Power revises local content norms for HVDC substations

May 4, 2026

The Ministry of Power has tightened local content requirements for high voltage direct current (HVDC) transmission systems under the public procurement preference to Make in India framework. The revised order introduces a phased minimum local […]

No Picture
State Sector

UPPCL announces results for 375 MW/1,500 MWh BESS

May 4, 2026

Uttar Pradesh Power Corporation Limited has awarded its 375 MW/1,500 MWh battery energy storage system (BESS) tender to KCC Buildcon Private Limited, Agastya Energy Industries Private Limited and MKC Infrastructure Limited. The 15-year tender was […]

No Picture
Central Sector

Coal India secures LoA from GRIDCO for 320 MWh BESS project in Odisha

May 4, 2026

Coal India Limited has received a letter of award (LoA) from GRIDCO Limited for setting up a 320 MWh battery energy storage system (BESS) project in Odisha. The project will have a capacity of 80 […]

No Picture
Private Sector

Dalmia Cement acquires stake in Oyster Renewable Energy’s subsidiary 

May 4, 2026

Dalmia Cement (Bharat) Limited, a wholly owned subsidiary of Dalmia Bharat Limited, has entered into a share subscription and shareholders’ agreement along with a power consumption agreement to acquire a stake in Oyster Green Hybrid […]

No Picture
Private Sector

Purvah Green signs PPA with SECI for 250 MW wind project

May 4, 2026

Purvah Green, a subsidiary of Calcutta Electric Supply Corporation (CESC), has signed a power purchase agreement (PPA) with the Solar Energy Corporation of India Limited (SECI) for a 250 MW wind project. The capacity was […]

No Picture
International News

TotalEnergies and Nextnorth secures financing for 440 MWp solar project in the Philippines

May 4, 2026

TotalEnergies and Nextnorth have secured financing for a 440 MWp solar photovoltaic project in the Philippines. The project will be developed in Ilagan, Isabela province, with a total investment of around USD 300 million. TotalEnergies […]

No Picture
International News

Sungrow to expand into integrated energy solutions for data centres and mining sector

May 4, 2026

  Sungrow is set to expand its integrated energy solutions for data centres, mining operations and electric vehicle charging projects. For data centres, the company plans to launch solid-state transformer solutions to reduce space requirements […]

No Picture
Central Sector

Ministry of Mines approves 58 companies under critical mineral recycling scheme

May 1, 2026

The Ministry of Mines has approved 58 companies as eligible participants under the incentive scheme for promotion of critical mineral recycling as notified under the national critical mineral mission. The scheme has a total outlay […]

No Picture
Central Sector

POWERGRID board approves Rs 40 billion loan facility from SBI

May 1, 2026

Power Grid Corporation of India Limited’s (POWERGRID) board of directors has approved raising funds through an unsecured rupee term loan or line of credit bank facility of up to Rs 40 billion from State Bank […]

No Picture
State Sector

Tamil Nadu government to release Rs 173.07 billion subsidy to TNPDCL in 2026-27

May 1, 2026

The Tamil Nadu government is set to release Rs 173.07 billion to Tamil Nadu Power Distribution Corporation Limited (TNPDCL) towards electricity subsidies for various consumer categories during 2026-27, marking an increase of around Rs 13 […]

No Picture
State Sector

Maharashtra cabinet approves Rs 123.03 billion MAGESTIC scheme

May 1, 2026

The Maharashtra cabinet has approved the Maharashtra Accelerating Green Energy and Storage Technologies Integration in Connected Grid (MAGESTIC) scheme to increase the share of renewable energy in the state’s energy mix from 17 per cent […]

No Picture
Central Sector

Ministry of Coal issues LoA to Kartikay Vayunandana for coal gasification project

May 1, 2026

The Ministry of Coal has issued a letter of award (LoA) to Kartikay Vayunandana Private Limited under category III of round II of the Rs 85 billion financial incentive scheme for promotion of coal/lignite gasification […]

Posts pagination

1 2 … 541 »

Recent Posts

  • Exploring CfDs: Shift towards market-linked renewable power procurement

    May 5, 2026
    The Ministry of New and Renewable Energy (MNRE) has notified guidelines for its 500 MW pilot Contract for Difference (CfD) …Read More »
  • Damodar Valley Corporation: Focus on flexibilising and dercarbonising its thermal fleet

    May 5, 2026
    The Damodar Valley Corporation (DVC) is a statutory body established on July 7, 1948, by an act of the Constituent …Read More »
  • AERB approves clearance for equipment installation at Kudankulam units 5 and 6

    May 5, 2026
    The Atomic Energy Regulatory Board (AERB) has approved Nuclear Power Corporation of India Limited (NPCIL) for major equipment erection at …Read More »

Powerline

SubscribeSeptember Issue

  • HOME
  • EDITORIAL
  • GENERATION
  • TRANSMISSION
  • DISTRIBUTION
  • RENEWABLES
  • REGULATION
  • FINANCE
  • SMART GRIDS
  • NEWS
  • SPECIALS
  • COMPANIES
  • FORUM
  • PERSPECTIVE
  • INFOCUS
  • SPECIAL SECTION
  • INDUSTRIAL POWER
  • PEOPLE
  • COMPANY RELEASE
  • MAGAZINES
  • DIRECTORIES
  • CONFERENCES
  • CUSTOM EVENTS
  • RESEARCH
  • globaltransmission.info
  • globalmasstransit.net
  • southeastasiainfra.com
  • indiainframonitor.com
  • indiapowerregulation.com
  • tele.net.in
  • indianinfrastructure.com
  • renewablewatch.in
  • smartutilities.net.in
  • Privacy Policy
  • Terms and Conditions
  • linkedin
  • twitter
  • youtube
  • facebook

COPYRIGHT © 2017-2025 | POWER LINE

Error: Contact form not found.

    GET ACCESS TO OUR ARTICLES

    Enter your email address

    Error: Contact form not found.

    Error: Contact form not found.

    Error: Contact form not found.

      Download Rate Card for Overseas Companies

      Verify Code (required)

        Download Rate Card for Indian Companies

        Verify Code (required)

          Error: Contact form not found.