• Ezine Archive
  • 25 Years of Power Line
    • 25th Anniversary Edition
    • Power Line Rewind
  • Subscribe
  • Advertise
  • About Us
  • Contact Us
  • linkedin
  • twitter
  • youtube
  • Facebook
  • Spotify
  • apple
Power Line Magazine
  • Home
  • Editorial
  • Generation
  • Transmission
  • Distribution
  • Renewables
  • Regulation
  • Specials
  • Finance
  • Smart grids
  • Knowledge Bank
  • News
    • Reforms and Regulations
    • Central Sector
    • State Sector
    • Private Sector
    • Projects & Ventures
    • International News
  • Companies
  • Forum
  • Perspective
  • EXPERT OPINION
  • Infocus
    • Grid Modernisation & Strengthening
    • Metering Billing & Collection
    • Energy Management and Efficiency
    • IT & OT Integration
    • Water Management
    • Transmission Infrastructure
    • Renewable Energy
    • Power Generation
    • Substations
    • Coal-based Power Generation
    • Power Distribution in India
    • Wind Power In India
    • Diesel Engines & Gensets
  • Special Section
    • Electric Vehicles
    • Renewable Energy
    • Coal-based Power Generation
    • HVDC Technology
    • Towers and Structures
    • BTG Equipment
    • Ash Management & Handling
    • Substations & Switchgear
    • Grid Modernisation & Strengthening
    • Environmental Solutions for Power Plants
    • Hydro Power in India
    • Quality of Power in India
    • Smart Grids in India
    • Cables & Conductors
    • More…
      • Insulators
      • Microgrids
      • Smart Grids in India
      • Substation Automation
      • Power Generation
      • Solar Power
  • Industrial Power
  • People
  • INDUSTRY SPEAK
  • Company Release
  • White Papers
  • Power Data
    • Power Data
    • Power Trading
  • Photogallery
  • Videos
  • Webinars
  • TransTech
    • TransTech India 2025
    • TransTech India 2024
  • Upcoming Events
  • PowerLine South Asia
  • Sponsored Content
  • Powerline Marketplace
HomeForum of Regulators

Forum of Regulators

Regulation

Computing Charges: FoR’s model regulations for green energy open access consumers

February 6, 2023

The Forum of Regulators (FoR) has notified the Model Regulations for Calculation of Open Access and Banking Charges for Green Energy Open Access Consumers, in line with the Mi­ni­stry of Power’s (MoP) Electricity (Pro­mo­ting Renewable […]

Power Quality

Setting Standards: Regulatory intervention needed to streamline power quality standards

January 4, 2023

The Electricity Act, 2003 highlights the basic need of consumers for continuous, reliable and quality supply by the distribution utilities. With the accelerated growth of renewable energy such as solar and wind; and the rise […]

Regulation

Streamlining the Merit Order: POSOCO releases consultation paper on optimal utilisation of ISGS capacity

November 17, 2018

In September 2018, the Power System Corporation of India (POSOCO) published a consultation paper on “Security Constrained Economic Dispatch (SCED) of ISGS (interstate generating station) Pan India”. Through this paper, it aims to find an […]

Regulation

Power Quality Regulations: FoR report takes a comprehensive look at key issues

November 4, 2018

Power quality refers to both the extent of deviation or distortion in pure supply waveform and continuity in supply. Any significant deviation in the magnitude, frequency, waveform or symmetry of line voltages is a potential […]

Renewables

Peaking Power Options: Industry looks for solutions to cope with increasing renewables generation

April 5, 2017

In light of the huge renewable capacity addition planned in the country, peaking power is emerging as the centrepiece of discussions in the sector. The intermittent and unpredictable nature of renewables makes it challenging to […]

Recent Posts

  • Siemens Energy commissions 145 kV SF₆-free circuit breaker in Goa

    September 8, 2026
    Siemens Energy India Limited has commissioned its first 145 kV SF₆-free circuit breaker in India for the Goa Electricity Department. …Read More »
  • GridCrest Technologies emerges L1 for KSEB smart metering project

    September 8, 2026
    GridCrest Technologies Private Limited has emerged as the lowest bidder (L1) for Kerala State Electricity Board’s (KSEB) smart metering project. …Read More »
  • Mazagon Dock Shipbuilders secures Rs 1.18 billion order from MSETCL

    September 8, 2026
    Mazagon Dock Shipbuilders Limited has received an order valued at nearly Rs 1.18 billion from Maharashtra State Electricity Transmission Company …Read More »

Powerline

SubscribeSeptember Issue

  • HOME
  • EDITORIAL
  • GENERATION
  • TRANSMISSION
  • DISTRIBUTION
  • RENEWABLES
  • REGULATION
  • FINANCE
  • SMART GRIDS
  • NEWS
  • SPECIALS
  • COMPANIES
  • FORUM
  • PERSPECTIVE
  • INFOCUS
  • SPECIAL SECTION
  • INDUSTRIAL POWER
  • PEOPLE
  • COMPANY RELEASE
  • MAGAZINES
  • DIRECTORIES
  • CONFERENCES
  • CUSTOM EVENTS
  • RESEARCH
  • globaltransmission.info
  • globalmasstransit.net
  • southeastasiainfra.com
  • indiainframonitor.com
  • indiapowerregulation.com
  • tele.net.in
  • indianinfrastructure.com
  • renewablewatch.in
  • smartutilities.net.in
  • Privacy Policy
  • Terms and Conditions
  • linkedin
  • twitter
  • youtube
  • facebook

COPYRIGHT © 2017-2025 | POWER LINE

Error: Contact form not found.

    GET ACCESS TO OUR ARTICLES

    Enter your email address

    Error: Contact form not found.

    Error: Contact form not found.

    Error: Contact form not found.

      Download Rate Card for Overseas Companies

      Verify Code (required)

        Download Rate Card for Indian Companies

        Verify Code (required)

          Error: Contact form not found.