• Ezine Archive
  • 25 Years of Power Line
    • 25th Anniversary Edition
    • Power Line Rewind
  • Subscribe
  • Advertise
  • About Us
  • Contact Us
  • linkedin
  • twitter
  • youtube
  • Facebook
Power Line Magazine
  • Home
  • Editorial
  • Generation
  • Transmission
  • Distribution
  • Renewables
  • Regulation
  • Specials
  • Finance
  • Smart grids
  • Knowledge Bank
  • News
    • Reforms and Regulations
    • Central Sector
    • State Sector
    • Private Sector
    • Projects & Ventures
    • International News
  • Companies
  • Forum
  • Perspective
  • EXPERT OPINION
  • Infocus
    • Grid Modernisation & Strengthening
    • Metering Billing & Collection
    • Energy Management and Efficiency
    • IT & OT Integration
    • Water Management
    • Transmission Infrastructure
    • Renewable Energy
    • Power Generation
    • Substations
    • Coal-based Power Generation
    • Power Distribution in India
    • Wind Power In India
    • Diesel Engines & Gensets
  • Special Section
    • Electric Vehicles
    • Renewable Energy
    • Coal-based Power Generation
    • HVDC Technology
    • Towers and Structures
    • BTG Equipment
    • Ash Management & Handling
    • Substations & Switchgear
    • Grid Modernisation & Strengthening
    • Environmental Solutions for Power Plants
    • Hydro Power in India
    • Quality of Power in India
    • Smart Grids in India
    • Cables & Conductors
    • More…
      • Insulators
      • Microgrids
      • Smart Grids in India
      • Substation Automation
      • Power Generation
      • Solar Power
  • Industrial Power
  • People
  • INDUSTRY SPEAK
  • Company Release
  • White Papers
  • Power Data
    • Power Data
    • Power Trading
  • Photogallery
  • Videos
  • Webinars
  • TransTech
    • TransTech India 2025
    • TransTech India 2024
  • Upcoming Events
  • PowerLine South Asia
  • Sponsored Content
  • Powerline Marketplace
HomeSpecial SectionCables & Conductors

Cables & Conductors

Special Section

Maintenance Measures: Best practices to ensure cable health

January 15, 2017

Continued maintenance of power cables is vital to ensure the reliability of power distribution systems because fixing faults after they occur can be challenging, expensive and time consuming. Routine maintenance minimises the occurrence of cable […]

Special Section

Fault Lines: Key causes for power cable failures

January 15, 2017

Although power cables are manufactured in controlled environments with sophisticated monitoring, cable failures do occur. Different types of cables are prone to specific types of failures. Since the 1990s, cross-linked polyethylene (XLPE) cables have become […]

Special Section

Network Revamp: Improving performance through re-conductoring

January 15, 2017

The power sector is undergoing dynamic transformation with constantly increasing generation and transmission requirements. However, inadequate and obsolete networks are a key challenge. Even though investments in new transmission lines present an ideal solution, these […]

Special Section

Positive Demand Outlook: Government initiatives create a huge market opportunity

January 15, 2017

Significant capex is expected to be made in the distribution segment over the next few years, driven largely by the central government’s twin programmes – the Deendayal Upadhyaya Gram Jyoti Yojana (DDUGJY) and the Integrated […]

Special Section

Covered Conductors: Growing adoption by utilities to enhance safety and lower costs

January 15, 2017

For transmitting electricity to consumers, utilities use overhead and underground cables. Conventionally, bare overhead conductors are used since they are the cheapest and easiest to build. They utilise air as natural insulation and there is […]

Special Section

Future Positive: Network strengthening drives demand for cables and conductors

January 15, 2017

The cables and conductors market has grown at a significant rate in the past few years on the back of investments in the power and infrastructure sectors. The current manufacturing base is well established with […]

Posts pagination

« 1 2

Recent Posts

  • RECPDCL invites bids for transmission projects to evacuate 21.5 GW renewable energy in Gujarat

    May 8, 2026
    REC Power Development and Consultancy Limited (RECPDCL) has invited bids to develop two interstate transmission projects for evacuating 21.5 GW …Read More »
  • Philippine province rolls out solar rooftop campaign in tie-up with ACEN, GCash

    May 8, 2026
    The Provincial Government of Ilocos Norte has entered into a partnership with ACEN, GCash, Fuse Financing Inc., Solaric Philippines, and …Read More »
  • Fugro secures geotechnical contract for Taiwan’s 600 MW FengMiao II offshore wind farm

    May 8, 2026
    Fugro has secured the geotechnical site investigation contract for the 600 MW FengMiao II Offshore Wind Farm in Taiwan from …Read More »

Powerline

SubscribeSeptember Issue

  • HOME
  • EDITORIAL
  • GENERATION
  • TRANSMISSION
  • DISTRIBUTION
  • RENEWABLES
  • REGULATION
  • FINANCE
  • SMART GRIDS
  • NEWS
  • SPECIALS
  • COMPANIES
  • FORUM
  • PERSPECTIVE
  • INFOCUS
  • SPECIAL SECTION
  • INDUSTRIAL POWER
  • PEOPLE
  • COMPANY RELEASE
  • MAGAZINES
  • DIRECTORIES
  • CONFERENCES
  • CUSTOM EVENTS
  • RESEARCH
  • globaltransmission.info
  • globalmasstransit.net
  • southeastasiainfra.com
  • indiainframonitor.com
  • indiapowerregulation.com
  • tele.net.in
  • indianinfrastructure.com
  • renewablewatch.in
  • smartutilities.net.in
  • Privacy Policy
  • Terms and Conditions
  • linkedin
  • twitter
  • youtube
  • facebook

COPYRIGHT © 2017-2025 | POWER LINE

Error: Contact form not found.

    GET ACCESS TO OUR ARTICLES

    Enter your email address

    Error: Contact form not found.

    Error: Contact form not found.

    Error: Contact form not found.

      Download Rate Card for Overseas Companies

      Verify Code (required)

        Download Rate Card for Indian Companies

        Verify Code (required)

          Error: Contact form not found.