• Ezine Archive
  • 25 Years of Power Line
    • 25th Anniversary Edition
    • Power Line Rewind
  • Subscribe
  • Advertise
  • About Us
  • Contact Us
  • linkedin
  • twitter
  • youtube
  • Facebook
Power Line Magazine
  • Home
  • Editorial
  • Generation
  • Transmission
  • Distribution
  • Renewables
  • Regulation
  • Specials
  • Finance
  • Smart grids
  • Knowledge Bank
  • News
    • Reforms and Regulations
    • Central Sector
    • State Sector
    • Private Sector
    • Projects & Ventures
    • International News
  • Companies
  • Forum
  • Perspective
  • EXPERT OPINION
  • Infocus
    • Grid Modernisation & Strengthening
    • Metering Billing & Collection
    • Energy Management and Efficiency
    • IT & OT Integration
    • Water Management
    • Transmission Infrastructure
    • Renewable Energy
    • Power Generation
    • Substations
    • Coal-based Power Generation
    • Power Distribution in India
    • Wind Power In India
    • Diesel Engines & Gensets
  • Special Section
    • Electric Vehicles
    • Renewable Energy
    • Coal-based Power Generation
    • HVDC Technology
    • Towers and Structures
    • BTG Equipment
    • Ash Management & Handling
    • Substations & Switchgear
    • Grid Modernisation & Strengthening
    • Environmental Solutions for Power Plants
    • Hydro Power in India
    • Quality of Power in India
    • Smart Grids in India
    • Cables & Conductors
    • More…
      • Insulators
      • Microgrids
      • Smart Grids in India
      • Substation Automation
      • Power Generation
      • Solar Power
  • Industrial Power
  • People
  • INDUSTRY SPEAK
  • Company Release
  • White Papers
  • Power Data
    • Power Data
    • Power Trading
  • Photogallery
  • Videos
  • Webinars
  • TransTech
    • TransTech India 2025
    • TransTech India 2024
  • Upcoming Events
  • PowerLine South Asia
  • Sponsored Content
  • Powerline Marketplace
HomeR&M

R&M

Hydro Power in India

Clear Benefits: RMU&LE can play a critical role in building hydro capacity

January 6, 2022

Renovation and modernisation (R&M) of hydroelectric projects (HEPs) is a cost-effective way to deal with technological obsolescence. It re­stores lost capacity and improves the av­ailability, performance, reliability and ef­ficiency of the plant. It also helps […]

Special Section

Enhancing Efficiency: R&M experience of coal-based power plants

November 14, 2018

The renovation and modernisation (R&M) of thermal power plants (TPPs) is undertaken primarily to equip existing units with the latest technologies in order to improve their performance in terms of output, reliability and availability, reduce […]

Infocus

Action Plan: Energy efficiency initiatives for TPPs

October 3, 2017

Coal-based power plants account for around 75 per cent of India’s thermal power generation and a significant share of carbon emissions. According to the latest data from the Central Electricity Authority (CEA), carbon dioxide (CO2) […]

Transmission

GETCO: Focus on grid modernisation and renewable energy integration

August 30, 2017

Gujarat’s state transmission company, Gujarat Energy Transmission Corporation Limited (GETCO) has drawn up a comprehensive plan for modernising and augmenting its infrastructure over the next four years. Investments in transmission are driven by the need […]

Forum

Evolve or Perish: Challenging future for coal-based thermal plant equipment manufacturers

June 18, 2017

Indian power scenario – Overestimated demand and rise of renewables On the back of rapid capacity addition, India’s total installed capacity has reached 320 GW this March, with coal-based thermal power and renewable energy accounting […]

Infocus

Powering Up: Addressing the challenges faced by stressed coal-based projects

April 5, 2017

Coal is the primary source of power generation in the country, accounting for around 60 per cent of the total installed base and 78 per cent of the total power generation. However, over the past […]

Companies

WBPDCL: Supercritical and clean energy focus

April 2, 2017

West Bengal’s energy availability in the past five years or so has seen a significant improvement with both peak and energy deficits of less than 1 per cent. The state’s leading generating company, West Bengal […]

Recent Posts

  • EIE Renewables signs a share purchase agreement to acquire stake in 37.5 MW BESS project in Bihar

    April 24, 2026
    EIE Renewables Private Limited has signed a share purchase and options agreement to acquire PRA Bihar BESS Private Limited, a …Read More »
  • Saatvik Green Energy acquires 80 per cent stake in Melcon Transformers

    April 24, 2026
    Saatvik Green Energy has acquired an 80 per cent equity stake in Melcon Transformers and Electricals Private Limited through a …Read More »
  • Indonesia launches 1.3 GW rooftop solar capacity

    April 24, 2026
    Indonesia has launched 1.3 GW of rooftop solar capacity under a programme led by the Ministry of Energy and Mineral …Read More »

Powerline

SubscribeSeptember Issue

  • HOME
  • EDITORIAL
  • GENERATION
  • TRANSMISSION
  • DISTRIBUTION
  • RENEWABLES
  • REGULATION
  • FINANCE
  • SMART GRIDS
  • NEWS
  • SPECIALS
  • COMPANIES
  • FORUM
  • PERSPECTIVE
  • INFOCUS
  • SPECIAL SECTION
  • INDUSTRIAL POWER
  • PEOPLE
  • COMPANY RELEASE
  • MAGAZINES
  • DIRECTORIES
  • CONFERENCES
  • CUSTOM EVENTS
  • RESEARCH
  • globaltransmission.info
  • globalmasstransit.net
  • southeastasiainfra.com
  • indiainframonitor.com
  • indiapowerregulation.com
  • tele.net.in
  • indianinfrastructure.com
  • renewablewatch.in
  • smartutilities.net.in
  • Privacy Policy
  • Terms and Conditions
  • linkedin
  • twitter
  • youtube
  • facebook

COPYRIGHT © 2017-2025 | POWER LINE

Error: Contact form not found.

    GET ACCESS TO OUR ARTICLES

    Enter your email address

    Error: Contact form not found.

    Error: Contact form not found.

    Error: Contact form not found.

      Download Rate Card for Overseas Companies

      Verify Code (required)

        Download Rate Card for Indian Companies

        Verify Code (required)

          Error: Contact form not found.