• Ezine Archive
  • 25 Years of Power Line
    • 25th Anniversary Edition
    • Power Line Rewind
  • Subscribe
  • Advertise
  • About Us
  • Contact Us
  • linkedin
  • twitter
  • youtube
  • Facebook
Power Line Magazine
  • Home
  • Editorial
  • Generation
  • Transmission
  • Distribution
  • Renewables
  • Regulation
  • Specials
  • Finance
  • Smart grids
  • Knowledge Bank
  • News
    • Reforms and Regulations
    • Central Sector
    • State Sector
    • Private Sector
    • Projects & Ventures
    • International News
  • Companies
  • Forum
  • Perspective
  • EXPERT OPINION
  • Infocus
    • Grid Modernisation & Strengthening
    • Metering Billing & Collection
    • Energy Management and Efficiency
    • IT & OT Integration
    • Water Management
    • Transmission Infrastructure
    • Renewable Energy
    • Power Generation
    • Substations
    • Coal-based Power Generation
    • Power Distribution in India
    • Wind Power In India
    • Diesel Engines & Gensets
  • Special Section
    • Electric Vehicles
    • Renewable Energy
    • Coal-based Power Generation
    • HVDC Technology
    • Towers and Structures
    • BTG Equipment
    • Ash Management & Handling
    • Substations & Switchgear
    • Grid Modernisation & Strengthening
    • Environmental Solutions for Power Plants
    • Hydro Power in India
    • Quality of Power in India
    • Smart Grids in India
    • Cables & Conductors
    • More…
      • Insulators
      • Microgrids
      • Smart Grids in India
      • Substation Automation
      • Power Generation
      • Solar Power
  • Industrial Power
  • People
  • INDUSTRY SPEAK
  • Company Release
  • White Papers
  • Power Data
    • Power Data
    • Power Trading
  • Photogallery
  • Videos
  • Webinars
  • TransTech
    • TransTech India 2025
    • TransTech India 2024
  • Upcoming Events
  • PowerLine South Asia
  • Sponsored Content
  • Powerline Marketplace
Homethermal power plants

thermal power plants

O&M of Power Plants

Evolving Practices: TPPs transition to reliability-centred maintenance

April 14, 2026

Operations and maintenance (O&M) services play a critical role in ensuring the sustained performance, reliability and efficiency of thermal power plants (TPPs). Robust O&M strategies not only help maintain high operational standards but also extend […]

Emission Control

Controlling Discharge: Water management and consumption

November 8, 2021

Among the industrial consumers of water, thermal power plants (TPPs) are the largest ones. It is estimated that TPPs account for nearly 88 per cent of industrial water consumption in the country. Moreover, 48 per […]

Specials

Flexible Operations: CEA comes out with recommendations for TPPs

April 28, 2019

India aims to achieve 175 GW of installed renewable energy capacity by 2022. While this is expected to lower carbon emissions and help meet the growing energy demand, the integration of renewables into the grid […]

Special Section

Enhancing Efficiency: R&M experience of coal-based power plants

November 14, 2018

The renovation and modernisation (R&M) of thermal power plants (TPPs) is undertaken primarily to equip existing units with the latest technologies in order to improve their performance in terms of output, reliability and availability, reduce […]

Stocks Deplete
Forum

Stocks Deplete: Coal concerns of TPPs

December 9, 2017

The coal availability scenario in India has witnessed a major turnaround over the past two years. Owing to significant efforts by Coal India Limited (CIL), coal production had increased considerably. However, of late, power plants […]

Ash Management & Handling

Better Utilisation: Key policy and regulatory measures

July 11, 2017

Fly ash management has been one of the key concerns of the power sector in India owing to the high ash content (30-45 per cent) in domestic coal, which accounts for over 70 per cent […]

Infocus

Reducing Water Use: Solutions for ash management

July 9, 2017

Environmental concerns associated with ash generation in thermal power plants (TPPs) have resulted in utilities adopting various measures such as reducing the water requirement for wet ash disposal, dry disposal of fly ash and utilisation […]

Specials

Streamlining Supply: SHAKTI brings clarity and transparency in coal linkage allocation

June 17, 2017

The country’s coal sector, which was plagued by demand-supply mismatches, has seen a massive turnaround in the past few years on the back of several key initiatives to improve coal availability, quality and supply chain […]

Specials

Fresh Lease of Life: Amendments made to Mega Power Policy, 2009

April 2, 2017

In March 2017, the Cabinet Committee on Economic Affairs approved amendments to the Mega Power Policy 2009, providing a five-year extension to mega power projects to sign long-term power purchase agreements (PPAs) to avail of […]

Recent Posts

  • Ganesh Green Bharat secures Rs 4.3 billion order for 630 Wp TOPCon modules

    April 20, 2026
    Ganesh Green Bharat Limited has secured a domestic order worth over Rs 4.3 billion for the supply of 630 Wp …Read More »
  • HD Renewable Energy and Tokyo Gas join forces for 340 MW BESS projects in Japan

    April 20, 2026
    HD Renewable Energy has partnered with Tokyo Gas Co to advance approximately 340 MW of battery energy storage (BESS) projects …Read More »
  • Naqaa Sustainable Energy set to develop 500 MW solar park with BESS in Botswana

    April 20, 2026
    Naqaa Sustainable Energy LLC is set to develop a 500 MW solar park with government of Botswana to develop a …Read More »

Powerline

SubscribeSeptember Issue

  • HOME
  • EDITORIAL
  • GENERATION
  • TRANSMISSION
  • DISTRIBUTION
  • RENEWABLES
  • REGULATION
  • FINANCE
  • SMART GRIDS
  • NEWS
  • SPECIALS
  • COMPANIES
  • FORUM
  • PERSPECTIVE
  • INFOCUS
  • SPECIAL SECTION
  • INDUSTRIAL POWER
  • PEOPLE
  • COMPANY RELEASE
  • MAGAZINES
  • DIRECTORIES
  • CONFERENCES
  • CUSTOM EVENTS
  • RESEARCH
  • globaltransmission.info
  • globalmasstransit.net
  • southeastasiainfra.com
  • indiainframonitor.com
  • indiapowerregulation.com
  • tele.net.in
  • indianinfrastructure.com
  • renewablewatch.in
  • smartutilities.net.in
  • Privacy Policy
  • Terms and Conditions
  • linkedin
  • twitter
  • youtube
  • facebook

COPYRIGHT © 2017-2025 | POWER LINE

Error: Contact form not found.

    GET ACCESS TO OUR ARTICLES

    Enter your email address

    Error: Contact form not found.

    Error: Contact form not found.

    Error: Contact form not found.

      Download Rate Card for Overseas Companies

      Verify Code (required)

        Download Rate Card for Indian Companies

        Verify Code (required)

          Error: Contact form not found.