• Ezine Archive
  • 25 Years of Power Line
    • 25th Anniversary Edition
    • Power Line Rewind
  • Subscribe
  • Advertise
  • About Us
  • Contact Us
  • linkedin
  • twitter
  • youtube
  • Facebook
Power Line Magazine
  • Home
  • Editorial
  • Generation
  • Transmission
  • Distribution
  • Renewables
  • Regulation
  • Specials
  • Finance
  • Smart grids
  • Knowledge Bank
  • News
    • Reforms and Regulations
    • Central Sector
    • State Sector
    • Private Sector
    • Projects & Ventures
    • International News
  • Companies
  • Forum
  • Perspective
  • EXPERT OPINION
  • Infocus
    • Grid Modernisation & Strengthening
    • Metering Billing & Collection
    • Energy Management and Efficiency
    • IT & OT Integration
    • Water Management
    • Transmission Infrastructure
    • Renewable Energy
    • Power Generation
    • Substations
    • Coal-based Power Generation
    • Power Distribution in India
    • Wind Power In India
    • Diesel Engines & Gensets
  • Special Section
    • Electric Vehicles
    • Renewable Energy
    • Coal-based Power Generation
    • HVDC Technology
    • Towers and Structures
    • BTG Equipment
    • Ash Management & Handling
    • Substations & Switchgear
    • Grid Modernisation & Strengthening
    • Environmental Solutions for Power Plants
    • Hydro Power in India
    • Quality of Power in India
    • Smart Grids in India
    • Cables & Conductors
    • More…
      • Insulators
      • Microgrids
      • Smart Grids in India
      • Substation Automation
      • Power Generation
      • Solar Power
  • Industrial Power
  • People
  • INDUSTRY SPEAK
  • Company Release
  • White Papers
  • Power Data
    • Power Data
    • Power Trading
  • Photogallery
  • Videos
  • Webinars
  • TransTech
    • TransTech India 2025
    • TransTech India 2024
  • Upcoming Events
  • PowerLine South Asia
  • Sponsored Content
  • Powerline Marketplace
Homestressed assets

stressed assets

Finance

Reviving Stressed Assets: MoP issues advisory to state gencos

December 6, 2023

In a recent initiative to accelerate the turnaround of stressed power assets, the Ministry of Power (MoP) has issued an advisory to state gencos and power departments, urging them to participate in the ongoing insolvency […]

Finance

Stressed Asset Deal: Vedanta acquires Athena Chhattisgarh Power

August 2, 2022

In a key recent development in the stressed asset space, mining major Vedanta Limited has acquired Athena Chhattisgarh Power Limited for Rs 5.65 billion to meet its captive power requirements. Athena Chhattisgarh Power currently has […]

Special Section

Coal Rules: Continued dominance despite growing challenges

November 20, 2018

India’s reliance on coal as the dominant source of power generation continues, with it accounting for about 75 per cent of the total generation in 2017-18. However, the segment faces multiple challenges. Slow capacity addition, […]

Distribution

Pilot Procurement Scheme: Some respite for gencos as PTC signs first round of PPAs

November 18, 2018

After a long lull, there is some visibility on the power purchase agreement (PPA) front for power gencos. In October this year, the first round of PPAs were signed under the government’s medium-term power procurement […]

Finance

Seeking a Reprieve: Sector looks for a resolution for its stressed assets as RBI deadline approaches

June 30, 2018

In a significant development, the Reserve Bank of India (RBI) has rejected the Ministry of Power’s (MoP) plea, seeking a reprieve for the power sector from the RBI guidelines issued in February this year. At […]

Forum

Seeking a Solution: Value unlocking options for stressed conventional and renewable power assets

June 28, 2018

The Reserve Bank of India’s (RBI) February 2018 circular, Resolution of Stressed Assets – Revised Framework, is expected to push the gross non-performing assets (NPAs) of banks to the north of Rs 9 trillion. The […]

Special Section

Reviving Stressed Assets: Challenges and possible solutions

October 2, 2017

  The power sector has been one of the major contributors to the country’s total stressed assets. Muted power demand from distribution companies and the resulting lack of new power purchase agreements (PPAs) have added […]

Forum

The Way Out?: Proposed changes to PPAs could help revive stressed assets

August 30, 2017

In a move to revive stranded generation capacity, the government is planning to modify the power purchase norms, whereby the fixed costs will be waived for discoms that enter into power purchase agreements (PPAs) with […]

Finance

Stressed Assets: MoP draws up strategies for stranded TPPs

August 30, 2017

The power sector accounts for a major share of the country’s stressed infrastructure assets. According to the latest data (as of July 2017) from the Department of Financial Services (DFS), Ministry of Finance, around 34 […]

Recent Posts

  • REC Limited reports Rs 163.08 billion net profit in 2025-26

    April 30, 2026
    REC Limited has reported a net profit of Rs 163.08 billion for 2025-26, registering an increase of about 2.67 per …Read More »
  • Waaree Energies Limited reports Rs 38.84 billion net profit in 2025-26

    April 30, 2026
    Waaree Energies Limited has reported a net profit of Rs 38.84 billion for 2025-26, registering an increase of about 101.45 …Read More »
  • J-POWER and Hazama Ando join 770 MW Pak Lay hydropower project in Laos

    April 30, 2026
    J-POWER and Hazama Ando have joined the 770 MW Pak Lay hydropower project in Laos through their joint venture, JH …Read More »

Powerline

SubscribeSeptember Issue

  • HOME
  • EDITORIAL
  • GENERATION
  • TRANSMISSION
  • DISTRIBUTION
  • RENEWABLES
  • REGULATION
  • FINANCE
  • SMART GRIDS
  • NEWS
  • SPECIALS
  • COMPANIES
  • FORUM
  • PERSPECTIVE
  • INFOCUS
  • SPECIAL SECTION
  • INDUSTRIAL POWER
  • PEOPLE
  • COMPANY RELEASE
  • MAGAZINES
  • DIRECTORIES
  • CONFERENCES
  • CUSTOM EVENTS
  • RESEARCH
  • globaltransmission.info
  • globalmasstransit.net
  • southeastasiainfra.com
  • indiainframonitor.com
  • indiapowerregulation.com
  • tele.net.in
  • indianinfrastructure.com
  • renewablewatch.in
  • smartutilities.net.in
  • Privacy Policy
  • Terms and Conditions
  • linkedin
  • twitter
  • youtube
  • facebook

COPYRIGHT © 2017-2025 | POWER LINE

Error: Contact form not found.

    GET ACCESS TO OUR ARTICLES

    Enter your email address

    Error: Contact form not found.

    Error: Contact form not found.

    Error: Contact form not found.

      Download Rate Card for Overseas Companies

      Verify Code (required)

        Download Rate Card for Indian Companies

        Verify Code (required)

          Error: Contact form not found.