• Ezine Archive
  • 25 Years of Power Line
    • 25th Anniversary Edition
    • Power Line Rewind
  • Subscribe
  • Advertise
  • About Us
  • Contact Us
  • linkedin
  • twitter
  • youtube
  • Facebook
  • Spotify
  • apple
Power Line Magazine
  • Home
  • Editorial
  • Generation
  • Transmission
  • Distribution
  • Renewables
  • Regulation
  • Specials
  • Finance
  • Smart grids
  • Knowledge Bank
  • News
    • Reforms and Regulations
    • Central Sector
    • State Sector
    • Private Sector
    • Projects & Ventures
    • International News
  • Companies
  • Forum
  • Perspective
  • EXPERT OPINION
  • Infocus
    • Grid Modernisation & Strengthening
    • Metering Billing & Collection
    • Energy Management and Efficiency
    • IT & OT Integration
    • Water Management
    • Transmission Infrastructure
    • Renewable Energy
    • Power Generation
    • Substations
    • Coal-based Power Generation
    • Power Distribution in India
    • Wind Power In India
    • Diesel Engines & Gensets
  • Special Section
    • Electric Vehicles
    • Renewable Energy
    • Coal-based Power Generation
    • HVDC Technology
    • Towers and Structures
    • BTG Equipment
    • Ash Management & Handling
    • Substations & Switchgear
    • Grid Modernisation & Strengthening
    • Environmental Solutions for Power Plants
    • Hydro Power in India
    • Quality of Power in India
    • Smart Grids in India
    • Cables & Conductors
    • More…
      • Insulators
      • Microgrids
      • Smart Grids in India
      • Substation Automation
      • Power Generation
      • Solar Power
  • Industrial Power
  • People
  • INDUSTRY SPEAK
  • Company Release
  • White Papers
  • Power Data
    • Power Data
    • Power Trading
  • Photogallery
  • Videos
  • Webinars
  • TransTech
    • TransTech India 2025
    • TransTech India 2024
  • Upcoming Events
  • PowerLine South Asia
  • Sponsored Content
  • Powerline Marketplace
  • TRAININGS
HomeAuthorsadmin

Articles by admin

No Picture
Central Sector

MNRE issues clarification on ALMM List-II exemption for rooftop solar projects

June 16, 2026

The Ministry of New and Renewable Energy (MNRE) has issued a clarification laying down the procedure for rooftop solar projects seeking exemption from the applicability of Approved List of Models and Manufacturers (ALMM) List-II for […]

No Picture
Central Sector

POWERGRID receives LoI for green hydrogen transmission project under TBCB

June 16, 2026

Power Grid Corporation of India Limited (POWERGRID) has received a letter of award (LoI) under tariff-based competitive bidding (TBCB) for the project “Transmission System for Proposed Green Hydrogen/Green Ammonia Projects in Kakinada Area (Phase-I)” on […]

No Picture
Private Sector

Suzlon launches S175 wind turbine platform with 5 MW rated capacity

June 16, 2026

Suzlon has launched its S175 wind turbine platform with a rated capacity of 5 MW. The platform was launched by the Union Minister for New and Renewable Energy. The S175 has been built using operational […]

No Picture
Central Sector

POWERGRID approves SCADA upgrade and JPY 80 billion loan facility

June 16, 2026

The board of directors of Power Grid Corporation of India Limited (POWERGRID) has approved the upgradation of supervisory control and data acquisition (SCADA) and associated systems at its National Transmission Asset Management Centre and Regional […]

No Picture
International News

Nigeria’s TCN commissions 300 MVA transformer at Katampe substation in Abuja

June 16, 2026

The government-owned Transmission Company of Nigeria (TCN) has commissioned a new 300 MVA, 330/132 kV power transformer at the 330/132/33 kV Katampe transmission substation in Abuja to strengthen electricity (FCT). Commissioned on May 24, 2026, […]

No Picture
International News

Japan plans up to 5 new nuclear reactors by 2040

June 16, 2026

Japan’s industry ministry has drafted a plan to rebuild 2-5 nuclear reactors by the 2040s to maintain stable electricity supply as aging plants are retired, PNA reported. The proposal marks the first time since the […]

EXPERT OPINION

Framework Reset: Revised rules for captive power plants

June 15, 2026

By Megha Arora, Partner; Abhishek Rohatgi, Associate; and Praneet Singh, Associate, CMS INDUSLAW On March 13, 2026, the Ministry of Power notified amendments to Rule 3 (Amendment) of the Electricity Rules, 2005, governing captive generating […]

EXPERT OPINION

Unlocking Growth: Need for stronger PPP frameworks in infrastructure development

June 15, 2026

By Amit Kapur, Partner, JSA The past three decades of experience in infrastructure development and public-private partnership (PPP) in India has established the necessity for constant regulatory oversight and contract management to identify and resolve […]

EXPERT OPINION

Transmission Losses: Small percentages, large realities

June 15, 2026

  By S.K. Soonee, Former and Founding Chief Executive Officer, Grid Controller of India Limited (GRID-INDIA); S.S. Barpanda, Former Director (Market Operations), GRID-INDIA; Debasis De, Former Executive Director, National Load Despatch Centre, GRID-INDIA Modest numbers […]

Substations & Switchgear

Predictive Strategies: Effective O&M practices for substations and switchgear

June 15, 2026

The reliable operation of substations and switchgear is critical to ensuring uninterrupted power supply, system stability and network safety. As power systems become more complex and utilities increasingly focus on improving operational efficiency, the role […]

Power Data

Power Generation: Total power generation in March 2026

June 15, 2026
Power Plant Automation

Digital Upgrade: Growing role of automation in enhancing renewable power operations

June 15, 2026

With renewable energy capacity expanding rapidly, power plants are increasingly using automation and digital tools to handle more complex operations and improve efficiency. Automation in the sector has progressed steadily, moving from basic mechanisation to […]

No Picture
State Sector

RECPDCL transfers Jalna power transmission SPV to MSETCL

June 15, 2026

REC Power Development and Consultancy Limited (RECPDCL) has transferred Jalna Power Transmission Limited, the project special purpose vehicle (SPV) for an intra-state transmission system project in Maharashtra, to Maharashtra State Electricity Transmission Company Limited (MSETCL) […]

No Picture
Central Sector

POWERGRID to implement transmission reconductoring project in West Bengal under RTM

June 15, 2026

Power Grid Corporation of India Limited (POWERGRID) has been assigned the “ERES-48: Jeerat–Rajarhat–Subhasgram reconductoring” project in West Bengal under the regulated tariff mechanism (RTM) framework. The project, estimated to cost about Rs 2.12 billion, is […]

No Picture
Private Sector

Hitachi Energy to set up Rs 20 billion transformer factory in Gujarat

June 15, 2026

Hitachi Energy India Limited has announced an investment of about Rs 20 billion to establish a new large power transformer manufacturing facility at Karjan in Vadodara, Gujarat. Scheduled for completion in FY 2027-28, the facility […]

No Picture
Projects & Ventures

Prozeal Green Energy secures 250 MW captive wind project from ONGC

June 15, 2026

Prozeal Green Energy Limited has received a notification of award from Oil and Natural Gas Corporation Limited (ONGC) for the development of 250 MW of inter-state transmission system-connected captive wind power projects in India. The […]

No Picture
Private Sector

Quality Power to acquire Winwin Speciality Insulators for Rs 3.15 billion

June 15, 2026

Quality Power Electrical Equipments Limited has executed a term sheet to acquire 100 per cent of the equity share capital of Winwin Speciality Insulators Limited (WSIL) for an enterprise value of about Rs 3.15 billion. […]

No Picture
Central Sector

NLC India and CSIR-CECRI sign MoU on critical mineral beneficiation and extraction

June 15, 2026

NLC India Limited (NLCIL) has signed a memorandum of understanding (MoU) with CSIR-Central Electrochemical Research Institute (CSIR-CECRI), Karaikudi, for collaboration in the field of critical and strategic mineral beneficiation and extraction technologies. Under the agreement, […]

No Picture
International News

Kuwait’s MEWRE plans 31 substations to expand transmission network

June 15, 2026

Kuwait’s Ministry of Electricity, Water and Renewable Energy (MEWRE) is planning to expand the country’s electricity transmission network through the installation of 31 transformer substations during the current fiscal year 2026-27 ending March 31, 2027. […]

No Picture
International News

Egypt’s Ministry of Electricity signs agreements for 1,500 MWh BESS projects 

June 15, 2026

Egypt’s Ministry of Electricity and Renewable Energy has signed agreements for two standalone BESS projects with a combined capacity of 1,500 MWh, in partnership with UAE-based AMEA Power – part of Al Nowais Group, and […]

Posts pagination

« 1 2 3 4 … 703 »

Recent Posts

  • BCCL hands over Dugda coal washery to JSW Steel

    June 23, 2026
    Bharat Coking Coal Limited (BCCL) has formally handed over its 2 million tonnes per annum (mtpa) Dugda coal washery to …Read More »
  • SECI and MahaGenco REL sign MoU to jointly develop renewable energy projects

    June 23, 2026
    The Solar Energy Corporation of India Limited (SECI) and MahaGenco Renewable Energy Limited (MahaGenco REL), a wholly owned subsidiary of …Read More »
  • Qara Energy–Hydelco wins 500 kV Gulf of Suez grid connection sections in Egypt

    June 23, 2026
    Qara Energy, an Egyptian energy and infrastructure company, in alliance with High Dam for Electrical and Industrial Projects Company (Hydelco), …Read More »

Powerline

SubscribeSeptember Issue

  • HOME
  • EDITORIAL
  • GENERATION
  • TRANSMISSION
  • DISTRIBUTION
  • RENEWABLES
  • REGULATION
  • FINANCE
  • SMART GRIDS
  • NEWS
  • SPECIALS
  • COMPANIES
  • FORUM
  • PERSPECTIVE
  • INFOCUS
  • SPECIAL SECTION
  • INDUSTRIAL POWER
  • PEOPLE
  • COMPANY RELEASE
  • MAGAZINES
  • DIRECTORIES
  • CONFERENCES
  • CUSTOM EVENTS
  • RESEARCH
  • globaltransmission.info
  • globalmasstransit.net
  • southeastasiainfra.com
  • indiainframonitor.com
  • indiapowerregulation.com
  • tele.net.in
  • indianinfrastructure.com
  • renewablewatch.in
  • smartutilities.net.in
  • Privacy Policy
  • Terms and Conditions
  • linkedin
  • twitter
  • youtube
  • facebook

COPYRIGHT © 2017-2025 | POWER LINE

Error: Contact form not found.

    GET ACCESS TO OUR ARTICLES

    Enter your email address

    Error: Contact form not found.

    Error: Contact form not found.

    Error: Contact form not found.

      Download Rate Card for Overseas Companies

      Verify Code (required)

        Download Rate Card for Indian Companies

        Verify Code (required)

          Error: Contact form not found.